Fixing Stage Inspection Checklist

Pre-payment checklist for your fixing (fit-out) stage inspection. Covers plastering, tiling, cabinetry, painting, electrical and plumbing fit-off, and all internal finishes before releasing your fixing stage payment.

When to use this checklist: Use this before releasing your fixing stage progress payment. The fixing stage covers all internal fit-out works — from plastered and painted walls through to tiling, cabinetry, fixtures, and finishes. This is the last chance to identify defects in trades work before the final clean and handover. Do not release the fixing stage payment if tiling is incomplete, painting has not received its final coat, or significant fit-off items are outstanding.
📋 Documentation to request
🪣 Plastering, walls, and ceilings
🖌️ Painting
🔲 Tiling — all areas
🍳 Kitchen
🚿 Bathrooms, ensuites, and laundry
Electrical fit-off
🏠 Flooring
📝 Defects noted on inspection
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Track defects digitally with Checka

This checklist helps you spot issues. Checka helps you document them with photos, share reports with your builder, and track what gets fixed.